Mike’s F1 build, Alexandria, Minnesota

As part of a work anniversary I received a 8 foot kayak, I used that for a while, but soon realized that I wanted something faster with better handling. After looking at plastic kayaks for a while and researching kayaks on the internet I decided to buy a used 13 foot fiberglass Epic kayak, and had a blast with it, was hooked. At the end of the season I happened upon a Greenland paddle discussion, liked some of the benefits I read regarding being easier on the shoulders(especially for older paddlers), so I built two Greenland paddles out of a 2×4 of Western Cedar(I found a great video on Brian Shultz’s Cape Falcon kayak website). After that I continued to look into kayaks, especially skin on frame, and after more research, bought the online video course for building a F1 modern kayak thru Cape Falcon kayak website. Most of my days are a few hours in the afternoon, work part of the days on weekends. After April 1, 2021(I retired on March 31, 2021), I was able to work on it more full time.

I finished one with pure Tung oil (Burnished it), and the other with Rubio Monocoat

March 19, 2021, gathering supplies

Went to the local lumberyard (Hilltop Lumber) and was able to find a number of 1×6 x14′ Western Cedar boards with straight grain and reasonably clear. I had picked up a hitch mounted pickup bed extension which helped to haul the board home. I was not able to find any ash from the lumber yards or cabinet makers, but was able to find hickory for the aft deck beam and aft deck stringers thru a local cabinet shop. I initially planned to purchase the rib bending boards thru Brian, but ended up getting the rib stock from J. W. Swan Boat Builders, (Brian was not able to get good bending stock). I did purchase the F1 parts kit (including coaming) thru Cape Falcon kayaks.

March 20, 2021 cutting up lumber

my setup on the side lawn, table saw, chop saw, and joiner/planer and saw horses

March 21, 2021 Start prep work

First thing I started on was the curved deck beams, glued up one at a time, only have 10 clamps. One thing I learned that you do not to wait too long to clean up the glue with your chisel, around 3 1/2 hours is best. Next I started to work on the gunwales, I setup my fixed base router (versus a plunger router in the videos) with a 1/4 ” spiral up-cut bit. I was a bit nervous about cutting the rib mortises, but once I got started, it went well. I then used the drill jig for the deck beam mortises, I used a 3/8 Forstner drill bit, and drilled the left side, right side, then middle, then drilled 2 more in between these three holes, then cleaned up the mortise with a chisel that I got clean mortises.

Two glued up, third curved deck beam needs to be cleaned up after gluing with water-proof Gorilla glue.
Rib mortises completed, little nerve racking, but once I got going, went well.
Mortise for curved deck beam

March 22, 2021 finish prep work

When getting ready to work on the stringers, I noticed that these did not look as good as they should. I then went to the lumber yard and picked up another 1x4x14′ Western Cedar. I then proceeded to cut and plane the stringers. I used the old stringers to do some practice work on rolling bevels, after I got the hang of it, I proceeded to plane the good stringers. The prep work took me about 11 hours.

March 25, 2021 first day of assembly

Today I started to assemble the pieces that I have been working on through the prep phase. First thing is to get the gunwales assembled with the forms and jigs. I had to use an additional set of straps to get the gunwales to align to the forms.

At this point the forms are in place and the gunwales are secured with artificial sinew.

At this point we have drilled and inserted the 1/4 inch dowels pegging the ends together. The alignment looks good.

March 26, 2021 attach deck beams with mortises

Today was spent cutting all the tenons for the deck beams, then installed the deck beams and pegged them to the gunwales with with 1/8 inch dowels.

cutting tenons
Pegging the beams with 1 inch long 1/8 in dowels to secure them in place
with the deck beams in place, ready for next step

March 27, 2021 pegging deck beams

Pegged deck beams with 1/4 inch dowels (made mine a little longer (4 inch) that Brian suggested, made it easier to drive all the way through.
The deck is complete, the bow and deck stems have also been cut. The is the end of day 1 in Brian’s videos, next is the ribs.

I placed an order for the rib bending stock from J. W. Swan Boat Building(got the lead from Brian’s Instagram feed), should be later this week.

April 3, 3021 The rib stock arrived today

my order from J. W. Swan came early, just ordered it on Monday

Today was a busy day measuring, and measuring again (like the saying measure twice(or 3 times) cut once), to get the ribs cut to the proper length based on the chart in the plans. Next removing the the edges, and trimming the thickness of the ends of the ribs, I used my joiner/planer, worked good.

I could not resist taking the classic picture of the ribs cut to length and ready for steaming.
I fired up the steamer to do some test runs on bending the ribs, was using some less than perfect wood(some that I had had set aside while sorting the ribs). ended up breaking a few before I remembered I need to use the belt for the first 3 ribs.

April 5, 2021 Rib bending day

I was a little nervous about bending the ribs, had a rocky start, and mixed up a couple of ribs, was one off (rib number versus rib mortise number), did not find that until I had all the ribs in place. I ending up breaking several ribs(glad I got 10 extra, used a few for testing, and broke a few). After a little work re-working ribs(they can be put back in the steamer to modify the shape), I was pleased with the result.

Next step is lashing down the stems. as you can see from this picture, the stringers are a little too long. I sent a text to Brian, and he said it would be ok to trim a little off them when you lash the bow end of the stringers.
This is the end of the day, got the keel and stringers lashed on. Starting to look more like a kayak.

April 6, 2021 lashing stringers

finished lashing the stingers today, bow and stern. There is a lot of tension in the stern, interesting lashing used, first the stringers are lashed together, then lashed to the existing gunwale lashing to hold the tips down.
Pegging the secondary stringers to the gunwale, opted to use the peg method versus the glue method.
Mounted the Wilderness Systems Foot Brace tracks
Working on cleaning up the bow to accept the front stringer

April 7, 2021 Bow and Aft Stringers

Today I lashed down the bow stringer, and cleaned up the frame

Lashed the bow stringer and cleaned up the bow section
Stern view, attached the aft deck stringers(the aft stringers are hickory) with dowels, then spent time rounding / cleaning them up with chisel and sand paper
Stern view of ribs and stringers

Started cleaning up the dowels(using the chisel to trim them flush with the gunwales), and using the Slick plane to take the edge off gunwales and other members.

April 9, 2021 Finish frame

One of the last things to do before I oil the frame with Watco Danish Oil is to check for symmetry. I noticed that the keel was a little crooked, to did some shifting and got that aligned, also check the main stringers and noticed that they had crept up a little in the stern, added another lashing to them, now they are where they belong, about a finger width between the stringer and the gunwale at the stern stem.

April 10, 2021 oil frame

The rain finally stopped, with allowed me to work outside oiling the frame with Watco Danish Oil today. Fortunately I was was outside as the fumes are strong, set up the saw horses in out pontoon parking pad, (is gravel). I applied the oil over the whole kayak, took almost a quart. I let it sit for 15 minutes(per the instructions), then proceeded to wipe it down(top and bottom). After an hour or so, I wiped it down again making sure all the lashing were dry, and there was not oil dripping from any mortise joint . Plan on putting it back outside again tomorrow to make sure it is dry. When I was wiping it down I noticed that one of the foot braces was mounted incorrectly, the little stop was at the cockpit end of the bracket, I then proceeded to swap it around so it was mounted correctly.

Bow, looking good

April 12, 2021 skinning the kayak

At this point I have pinned up the stern and bow stems. The chord is to assist in pulling a float / gear bag into the bow
bow sewed up

I had a neighbor come over help me pin the stern as I stretched the nylon, this needed as skin gets sewed up 2 1/2 inch short.

I used a soldering iron with cutting tip ( $7), it worked real good for cutting the nylon.

completed sewing up the bow and stern

I am glad I followed Brian’s suggestion to sew up the stern before doing the bow sewing, the stern is not near as nice as the bow sew job.

April 11, 2021 Coaming and dyeing skin

Me aligning the coaming before I sew it to the kayak
The coaming is sewed in place, I found that by clamping the #9 seine twine, I was able to keep it tight as I progressed around the coaming, actually twice around.

For the color I chose Sweet Potato Pie (a custom color Brian came up with (3 teaspoons of gold Ochre, 1/2 tsp Brown, and 1/2 tsp Russet) of Jacquard Acid dye mixed with 5 cups of water and 2 cups of vinegar. Applying the dye is messy(I used a 4 inch foam brush), as you want to get the dye on before the dye mix cools down.

Kayak drying after acid dye application

April 16, 2021 applying coating

Taping the desk edge in preparation for coating, need to add blue tape on the deck to stop any potential drips when coating the hull.

I used the 2 part Urethane from Corey at SkinBoats.com, applying 3 coats on the hull and 2 coats on the deck.

picture of the hull coated
Completed coating the deck, now this has to cure, typically takes 48 hours before I can continue with finishing the deck.
Cool picture inside the kayak looking toward the stern, shop light illuminating the rear corner of the kayak. The chord is used to secure a float bag in place.

April 19, 2021 finishing up

Today was deck finishing day, worked on installing the leather deck straps used to secure a paddle, and the end straps used to carry the kayak. While threading thru the leather strap I forgot to include the second toggle, fortunately I caught the mistake before I got too far. Pulling the leather straps is definitely a workout, definitely one of the harder tasks in building the kayak. I also installed the Wilderness Systems foot braces, Snap Dragon back band, keel protector strip and inside seat pad (Thermarest Ridgerest)

leather deck straps installed
HDPE keel guard
finished kayak

I believe it took me about 60 hours to assemble the kayak plus the 12 hours of prep work. The weight for the completed kayak is about 32 pounds.

Kydex keel protector

I added a 0.060 inch Kydex keel protector(you buy it in 12″ x 12″ sheets and form it with a heat gun or propane torch) in the bow section(to protect from sand / rock wearing the keel). I added one to my fiberglass kayak, and it worked well. I sprayed it with Cinnamon spray paint(as close as I could find in spray paint at Fleet Farm) then glued on using Marine Goop.

spare Greenland paddle on deck
complete with Cape Falcon kayak sticker

Hope to get some “on the water” pictures and reviews when the weather warms a bit(hopefully in May).

May 1, 2021 mainden voyage

Loaded the kayak into the back of the pickup with bed extender, I made two cradles for the kayak, one to up front , and another toward the back of the bed. I also wrapped the pool noodle on the bed extender with indoor / outdoor carpet to reduce friction. just need to secure the kayak before heading for the lake, fortunately, it is only a /12 mile to the landing
Got out on Lake Latoka today, ended up I over dressed a bit, had my wet suit on, got quite warm, the temperature got up to 87 degrees F today.

Th initial stability seemed less than my other kayak (Epic GP 13′ touring kayak), but I got more comfortable as time went on. One thing I did notice that it was quicker and faster than my other kayak. I started out with my euro paddle, did not want to introduce two new things at one. After awhile I switched to my 84 inch Greenland paddle, need to work on that. I am wondering if I need to increase the loom(this one has a 19 inch loom) as I was hitting the gunwales, will have to try my other Greenland paddle, has a 19.5 inch loom and is 87 inches long. After more time on the water, I realized that the loom was correct, I needed more work on my form, just needed more length, so I am using my 87 inch long paddle now.

cruising along
Having been out a number of times, I am getting much more comfortable with the primary / secondary stability. In the picture above I am pulling my grand-daughter in a 10 foot plastic kayak(that is a workout). I am also using my longer Greenland paddle (87 inch long with 19.5 inch loom) exclusively with the shorter Greenland paddle on deck as a spare.

Mike

View posts by Mike
My wife (Maralee) and I have lived in Alexandria, MN for the last 17 years

3 Comments

  1. Ethan
    May 10, 2021

    Very nice build. I am currently working on an almost identical boat! I have a soldering iron with a knife attachment and would like to know if you had any trouble with using it on the fabric?

    Reply
    1. Ethan Israel
      May 13, 2021

      When purchasing the coating did you buy the full order and one half order? How much coating did you use?

      Reply
  2. Ethan
    May 13, 2021

    When ordering the urethane from Corey did you purchase a one and a half orders? How much of the goop did you actually end up using?

    Reply

Leave a Reply to Ethan Israel Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Scroll to top